Customization: | Available |
---|---|
Parking Post: | 16 Bicycles |
Type: | Bike Parking Rack |
Still deciding? Get samples of US$ 220/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Type: | Vertical Bicycle Carrier Parking Support Two Tier Bike Stand Storage Rack |
2.Color: | Blue |
3.Size: | 3472*2041*2061mm |
4. Finish | Hot Galvanized |
5.Material: | Steel |
6.Logo | Print/Customized |
7.Sample Fee | 220 USD(Can be refunded in bulk.) |
8.Sample Time: | 7 days |
9.Packing Details: | Inner Packing: Bubble bag,cloth bag,or foam. Outer Packing:Carton The package can be Customized. |
10. Installation: | Floor Mounted |
11.Production Capacity: | 20ft container is 30-45days; 40ft container is 45-60 days. |
12.Weight | N.W: 600kg G.W:800kg |
Packing | In carton/wooden case/steel frame pallet or as required. |
Shipping | Sea shipping,air freight or express. |
Delivery Time | Within 30 working days on confirming the deposit. |
Tube Cutting
Laser cutting is a technology that uses a laser to cut materials, and is typically used for industrial manufacturing applications,
but is also starting to be used by schools, small businesses, and hobbyists. Laser cutting works by directing the output of a
high-power laser most commonly through optics. The laser optics and CNC (computer numerical control) are used to direct
the material or the laser beam generated.
Tube Bending
Tube bending is the umbrella term for metal forming processes used to permanently form pipes or tubing. One must
differentiate between form-bound and freeform-bending procedures, as well as between heat supported and cold forming
procedure
Welding
Welding is a fabrication or sculptural process that joins materials, usually metals or thermoplastics, by causing fusion,
which is distinct from lower temperature metal-joining techniques such as brazing and soldering, which do not melt
the base metal. In addition to melting the base metal, a filler material is typically added to the joint to form a pool of
molten material (the weld pool) that cools to form a joint that, based on weld configuration (butt, full penetration,
fillet, etc.), can be stronger than the base material (parent metal). Pressure may also be used in conjunction with heat,
or by itself, to produce a weld. Welding also requires a form of shield to protect the filler metals or melted metals from
being contaminated or oxidized.
Smoothing the surface
To make surface of the metal products clean and nice.
Suzhou Pioneer Vehicle Company was founded in 2000 years,we have more than 15 years of experience in processing
metal products.Our factory covers an area of more than 7000 square meters, we nearby the beautiful Lingyan mountain
which located in Mudu town,Suzhou city.Our factory have all kinds of stamping equipment around 30 sets,Semi-automatic
and full automatic spot welding machine 5 sets,Gear machine 2 sets,Sawing machine,CNC machine,CNC bending machine,
Pipe bending machine,Arc machine etc,more than 20 units types of welding machines.
There are various types of processing equipment more than 50 units.We have rich experience for Turning,Milling,Planing,
Grinding,Drilling and Tapping,Punching strerching,Welding bend etc.We have integrity and pragmatic spirit,we regard
product quality as the life of enterprise,we offer good quality and efficient service to the new and old customer!
Quality Assure | * ISO approve |
* 1-year warranty | |
* Rust-proof: 3-5 year for powder coated products and 10-15 years for galvanized products. | |
* Stable orders for North America, Europe and Australia market. |
1.Can you print our logo on the products?
- Yes, of course. Just give us your logo image and tell us your requirements, your logo will be perfectly shown on it.
2.Can we make our own design on the packaging?
- Sure, most of our clients are using their self-designed packaging.
3.If we can make some change to your products?
- Customization is welcomed! We are glad to assist you in making the products better and we will protect your design.
4.What's your lead time?
- Normally 7 working days for sample, 30 working days for mass production.
FOR MORE PRODUCTS,PLEASE CLICK HERE!